Built In Closet/Hideaway Overhead Storage
This bi-fold closet was added into an existing room. The double rod interior was designed as per the clients suggestion.
Wednesday, February 29, 2012
Monday, February 27, 2012
Friday, June 10, 2011
Studio Build Out
The client hired me to convert an existing shed/rear building into an artist's/work studio.
Before Photos
The cross beams were existing and the vaulted ceiling was finished around them.
Then a custom workbench was built-in.
Before Photos
These were taken after I put up the insulation, cut the window and fan holes, and installed them.
The sheetrock is beginning to go up on the ceiling.
The ceiling was well insulated.
After Photos
The cross beams were existing and the vaulted ceiling was finished around them.
Then a custom workbench was built-in.
The shelves were rough-milled reclaimed Oak.
The outside was cleaned up and painted by a different contractor.